Customization: | Available |
---|---|
CAS No.: | 7758-23-8/10031-30-8 |
Formula: | Ca(H2po4) |
Still deciding? Get samples of US$ 50/kg
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1-Methylcyclopropene(1-MCP), as a plant growth regulator, is an excellent ethylene inhibitor. The irreversible binding of 1-MCP to the ethylene receptor blocks the normal physiological function of ethylene, thereby delaying the quality decline caused by ethylene. In view of non-toxic, non-pollution and high efficiency, 1-MCP has broad application prospects in the preservation of fruits, vegetables and flowers. In some developed countries, 1-MCP, as a preservative, is called a revolutionary development.
Content: 3.3% 1-MCP
item | value |
Classification | Phosphate |
Type | Potassium Phosphate |
CAS No. | 7758-11 |
Other Names | Potassium Dibasic phosphate |
MF | K2HPO4 |
EINECS No. | 231-834-5 |
Place of Origin | China |
Jiangsu | |
Grade Standard | Electron Grade, Food Grade, Reagent Grade |
Purity | 98% |
Appearance | white powder |
Application | emulsifying salt |
Brand Name | klj |
Model Number | kul-1 |
Product Name | Dipotassium phosphate |
Color | White Powdery |
MOQ | 1kg |
Shelf Life: | 2 Years |
Sample | Availiable |
Packing | 25kg Paper Bag |
Keywords | Dipotassium phosphate anhydrous |
20FCL | 12MTS |
HS | 283524 |
1-MCP preservative is the idealist inhibitor for ethylene; it is wildly used as fresh-keeping agent
in agriculture industry by growers, packers, and shippers to maintain the quality of fruits and
vegetables by preventing or delaying the natural ripening process.
1. Reduce respiration, delay ripening and senescence.
2. Keep the original flavor for longer time.
3. Prolong the storage and shelf life.
4. Increase disease resistance, decrease evaporation,lighten the decay causing by physiological
disease and microorganism.
Packing
|
1kg/bag ,25kg/bag;25kg/drum; according to your requirements
|
|||
Transit
|
Fedex, TNT,DHL,EMS,and so on.
|
|||
Port
|
Shanghai/Tianjin/Dalian/Beijing/Xi'an
|
|||
Lead Time
|
3-5 working days upon received the payment
|
|||
For mass orders, it will be delivered by air or sea. Depending on your location, please allow 1-5 business days for your order to arrive. For small order, please expect 3-7 days by UPS DHL EMS. For mass order, please allow 5-8 days by Air, 15-30 days by Sea. |